China CCC
The scope of CCC certification for motor vehicles shall be in accordance with the requirements of the Implementing Rules for vehicles of category M, N and O (including complete vehicles and non-integrated vehicles). The certification according to the general safety standards eg GB 7258 "technical requirements for the safe operation of motor vehicles", For specific product inspection articles, please refer to the implementation rules of CNCA-C11-01: 2014 Automotive Annex 1 Type Test Projects and Standards.
90 days are set by law for cetification. According to experience, these sometimes take longer.
* it could result in a delay in processing:
if application documents are not complete,
if there are problems with testing in the Test Lab,
if there is a deviation in the audit.
Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2
Plant is classified after the initial audit in A, B, C, D.
A: Factory audit takes place once every 2 years.
B or C: Factory audit takes place once a year.
D: Factory audit takes place at least twice a year.
Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2
Initial Audit: up to 10 man day per model series, depending of subparts certified
FI audit: up to 6 man day per model series
Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,
CCAP-C11-01: 2014 / A1 page 14, item 10.3.2
Factory audit is performed according to IR CNCA-C11-01 Appendix 5
- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)
-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.
-Overview control: control of property, model and supplier of core material and core components, etc.
- Checking product compliance: running tests, final tests, etc.
Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.
Product Check: Requalification Test
Change control: control of change request, etc.
Control of serious quality problems: customer complaint, recall, etc.
Source: IR CNCA-C11-01 Appendix 5
Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1
Step 1: Group car first after series defined by manufacturer
Step 2: Units are removed from the same series
It can not be defined as a unit if:
- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.
- car series is not equal
- position of the engine is not equal (front, middle, rear)
- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)
- Drive is not equal (four-wheel, non-four-wheel)
- Sum of the axis is not equal
- Etc.
Within one unit:
- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2
- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15
- Limit parameters (total weight, distribution of front and rear axle): 20%
- Etc.
Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)
Limit within one unit: Engine KW: 30%, Displacement: 20%
Limit value for engine KW: 50%, engine capacity: 50%
Limit within one unit: total weight: 20%
Source: IR CNCA-C11-01 Appendix 2
See CCAP-C11-01: 2014 / A1 page 29-45
See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27
You work at your pace. You can handle your projects independently via our portal, as well as inquire about personal support. We have therefore committed ourselves to give you the opportunity to design your own processes, without having to give up the support through our portal through us
We offer you the opportunity to carry out your certification processes yourself, but without having to forego the know-how or the support of experienced employees. The online system is designed for a variety of certifications and offers you also FAQ lists, as well as ready-made forms and tables, as well as a module to clarify open questions with one of our employees.
In our fast time changes in business life are a constant accompaniment. Fixed structures that used to build up over many years can now be smashed very quickly. There are internal and external reasons for this. The CS gives an overview of the conformity during changes.
Since we all only have a limited time and financial capacity, and want to offer the customer a comprehensive service, cooperations only make sense among related organizations. These have a reliable structure, as well as a good interpersonal harmony.